SCOPE SUMMARY:
Addition of a connector between the main building and the cafeteria. Select lighting and architectural renovations throughout the existing building. Drainage remediation near the school’s parking lot.
DETAILED SCOPE:
|
|
- Relocate administration and clinic to the first floor
|
- Relocate classrooms to the second floor
|
- Repoint exterior cast stone joints
|
- Replace the Public Address System
|
- Addition Connection to Cafeteria/Gym building
|
|
|
- Refurbish existing terrazzo stairs
|
- Provide security updates including card access readers, door contacts (DISD to provide locations)
|
- Provide a secure front vestibule.
|
- Mild detergent medium pressure wash on stained or mildewed façade
|
- Partial removal and replace concrete sidewalks and pavement
|
- Replace fire alarm system
|
- Remove educational casework in classrooms
|
- Remove and replace ceiling with new acoustic lay-in ceiling tile and grid in Classrooms, Media Center, and Cafeteria
|
- Replace carpet / vinyl composition tile (VCT) and base in Classrooms and Auditorium
|
- Replace teaching surfaces at each classroom.
|
- Paint all previously painted interior surfaces in Classrooms and Cafeteria. Repair / patch walls prior to painting.
|
- Renovate corridor including, ceiling, flooring, and paint
|
- Provide interior lighting controls in Classrooms, Corridors, Media Center, Gym, and Cafeteria
|
- Replace interior lights with LED lighting in Classrooms, Corridors, Media Center, Gym and Cafeteria
|